So, while I wait, let's talk about cabinets. They've started to go in and it's another one of those steps that gets the excitement level up. Sure, they don't have drawers or doors on them yet, but especially in the kitchen, you can start to see the rooms come together.
They're all Doug Fir wood with melamine interiors. The doors and drawers will be the Doug Fir as well. This will match all the Doug Fir we reclaimed from the paneling, which then got planed and cut down into trim pieces. (btw, it never occurred to me until picking out our xmas tree this year, but half the trees out there are firs and a bunch of those are Douglas Fir. So, I guess we've got xmas trees throughout the house!)
Let's have a look at the kitchen...
The middle two shots are kind of fun because they're the before and after. There's one uninterupted 15' run of granite that will go one side and then the rangetop and sink will go on the other. That last shot shows were the bartop will be, which is over and extending beyond the sink.
Here's the music room coming together.
This room will be fun with space for guitars (hanging above the desk), an amp (in the cabinet in the first pic) and then the bench sitting right in front of the tall windows. With the 10 foot ceilings, this room will look really nice once it comes together.
And here's just a quick, unexciting pic of the kids bath:
Overall, I think things are coming along really well. The painters have been at it for the past couple days coating, sanding and then second coating all the wood. It looks like a disaster zone in there with that varnish and saw dust soaked and stuck to all the tape and paper covering the floors, walls and ceilings.
Supposedly some of the granite counters went in today, but we'll see. I'll snap some pics of the mess if all the paper and stuff is still there. The cabinets in the mud room, which will be out of laminate are delayed, so it will be a while before those come through. We'll see what Kathleen and Mike can do to get those sped up.
